Recognition

Awards, honours,
and milestones.

A record of recognized impact — across iPhone NPI, manufacturing excellence, and academia.

June 2026 · University of Leicester

Master of Engineering Management — Awarded with Distinction

Full-time postgraduate programme completed on the Leicester campus between 6 January 2025 and 23 June 2026. Officially confirmed by the University's Deputy Librarian.

DistinctionLeicesterSystems Engineering
Open the official letter →
2024

Manufacturing Excellence Award

Recognized for implementing DOE methodologies achieving 40% efficiency improvement in iPhone NPI projects at Foxconn.

FoxconnDOE
2024

IIT Madras UI/UX Excellence

Graduated with distinction (GPA 8.28/10) from the UI/UX Design Diploma at Indian Institute of Technology Madras.

IIT MadrasDistinction
2023

Process Optimization Achievement

Reduced process variations by 20% through data-driven optimization strategies during iPhone production.

SPCOptimization
2022

Quality Excellence Recognition

Achieved a 25% increase in manufacturing reliability through systematic Root Cause Analysis at Pegatron.

RCAQuality
Position of Responsibility

iPhone Product Line Lead

Oversaw NPI & manufacturing engineering for iPhone 12 mini, 13, 14 Plus, 15, 15 Pro Max, 16, 17, and SE 4th Generation across Pegatron and Foxconn.

AppleNPI
Papers & publications

Academic work.

University publications, research write-ups, and dissertation work will appear here as they are completed. Current MSc projects are listed on the Projects page.

MSc Dissertation — 2026

Final research dissertation in Engineering Management, completed as part of the Distinction-awarded Master of Engineering Management programme at the University of Leicester.

Read the dissertation ↓

Master's Dissertation · EG7302 · Leicester MEM

Which supply decision
keeps the mission alive?

An operations-research framework for sequencing logistics and resupply decisions on NASA's Lunar Gateway — a mixed-integer linear programming (MILP) model that trades fuel, time, cost and risk across competing mission windows. Awarded with Distinction.

NASA Lunar Gateway in orbit around the Moon
NASA · Artemis Programme

The Gateway, in orbit.

The international lunar outpost — Orion, HALO, PPE, Lunar I-Hab, Logistics Module — the system my dissertation models.

Labelled Gateway architecture — NASA, CSA, JAXA, ESA, MBRSC
The architecture
Partner-by-partner, module-by-module.

NASA · CSA · JAXA · ESA · MBRSC — every module is a decision variable.

Dissertation open toolchain — Gurobi, MATLAB, Python, draw.io, Jira, Blender
Open toolchain
Gurobi · MATLAB · Python · Blender · Jira.

Every artefact publicly reproducible. 4.2 s wall-clock, 203 binary variables.

Phase 3 Lean VSM — PCE 21.1% to 30.7% — Blender capsule models
Phase 3 · Lean VSM
PCE 21.1% → 30.7%.

Lead time 155 → 75 days. Current state vs future state rendered in Blender 4.x.

The problem

NASA has finite fuel. The Gateway has infinite options.

Every resupply window is a joint decision — which cargo, in which order, on which launch vehicle, from which depot. Pick the wrong sequence first and you don't get a smaller return, you often get none. The literature treats each sub-problem beautifully in isolation. It does not say which decision, on this mission, under this budget, pays off three windows from now.

0decision variables in the MILP model
0operational constraints encoded
0%projected cost reduction vs. a greedy baseline
0competing mission profiles compared end-to-end

The decision framework

Four gates between a budget and the right mission profile.

⚙

Scope the mission

Encode cargo manifest, resupply windows, and mission-critical dependencies as a structured decision graph.

∑

Model the trade

Formulate the MILP — fuel, mass, time, cost, risk — with explicit constraints on orbital insertion and crew safety.

△

Stress-test the plan

Sensitivity sweeps across budget, launch cadence, and failure scenarios to find the robust-not-fragile solution.

↗

Choose the sequence

The model surfaces a ranked sequence — not a single answer, but a defensible, documented chain of decisions.

What it taught me

Good engineering management isn't about finding the best option. It's about sequencing the right four.

The dissertation turned my instinct from Pegatron and Foxconn — fix the one constraint that bends everything else — into a mathematically defensible framework. The same logic that keeps a Lunar Gateway supplied is the logic that keeps an iPhone line yielding.