A record of recognized impact — across iPhone NPI, manufacturing excellence, and academia.
Full-time postgraduate programme completed on the Leicester campus between 6 January 2025 and 23 June 2026. Officially confirmed by the University's Deputy Librarian.
Recognized for implementing DOE methodologies achieving 40% efficiency improvement in iPhone NPI projects at Foxconn.
Graduated with distinction (GPA 8.28/10) from the UI/UX Design Diploma at Indian Institute of Technology Madras.
Reduced process variations by 20% through data-driven optimization strategies during iPhone production.
Achieved a 25% increase in manufacturing reliability through systematic Root Cause Analysis at Pegatron.
Oversaw NPI & manufacturing engineering for iPhone 12 mini, 13, 14 Plus, 15, 15 Pro Max, 16, 17, and SE 4th Generation across Pegatron and Foxconn.
University publications, research write-ups, and dissertation work will appear here as they are completed. Current MSc projects are listed on the Projects page.
Final research dissertation in Engineering Management, completed as part of the Distinction-awarded Master of Engineering Management programme at the University of Leicester.
Read the dissertation ↓Master's Dissertation · EG7302 · Leicester MEM
An operations-research framework for sequencing logistics and resupply decisions on NASA's Lunar Gateway — a mixed-integer linear programming (MILP) model that trades fuel, time, cost and risk across competing mission windows. Awarded with Distinction.
The international lunar outpost — Orion, HALO, PPE, Lunar I-Hab, Logistics Module — the system my dissertation models.
NASA · CSA · JAXA · ESA · MBRSC — every module is a decision variable.
Every artefact publicly reproducible. 4.2 s wall-clock, 203 binary variables.
Lead time 155 → 75 days. Current state vs future state rendered in Blender 4.x.
The problem
NASA has finite fuel. The Gateway has infinite options.
Every resupply window is a joint decision — which cargo, in which order, on which launch vehicle, from which depot. Pick the wrong sequence first and you don't get a smaller return, you often get none. The literature treats each sub-problem beautifully in isolation. It does not say which decision, on this mission, under this budget, pays off three windows from now.
The decision framework
Encode cargo manifest, resupply windows, and mission-critical dependencies as a structured decision graph.
Formulate the MILP — fuel, mass, time, cost, risk — with explicit constraints on orbital insertion and crew safety.
Sensitivity sweeps across budget, launch cadence, and failure scenarios to find the robust-not-fragile solution.
The model surfaces a ranked sequence — not a single answer, but a defensible, documented chain of decisions.
What it taught me
Good engineering management isn't about finding the best option. It's about sequencing the right four.
The dissertation turned my instinct from Pegatron and Foxconn — fix the one constraint that bends everything else — into a mathematically defensible framework. The same logic that keeps a Lunar Gateway supplied is the logic that keeps an iPhone line yielding.